First, the introduction
This series of tea drum crusher is one of the main products produced by our factory. The machine uses the operation of the cylinder to allow the tea leaves to pass through the vanes in the cylinder and deliver them without interruption. Its characteristics: 1, high temperature, easy to operate; 2, the machine has high hot air temperature, strong penetrating power, good green leaf color, complete leaf body, high aroma, effectively guarantee the internal nutrient content of tea; 3, killing efficiency High, suitable for tea factory to carry out assembly line operations; 4, the machine can be used to kill, can also be used for drying, roasting, and a wide range of uses.
Second, 6CST-80D technical parameters
Project | unit | Specification | |
Dimensions | mm | 5000×1200×1800 | |
Taiwan production | kg/h | 400-800 | |
heating power | kw | 80 | |
Roller diameter | cm | 80cm | |
Machine quality | kg | 1500 |
Third, the working principle
The heat in the machine is mainly supplied by the electric heater. The tea leaves are put into the cylinder through the feeding port and sent into the high temperature cylinder. During the continuous movement, the drum contacts the electric heater outside the cylinder to increase the temperature. The fresh leaves enter the high-heat cylinder. With the rotation of the cylinder, under the action of the spiral guide vanes on the inner wall of the cylinder, the cylinders are tumbling and alternately contacted with the wall of the cylinder to heat up to achieve the purpose of killing.
Fourth, the installation and operation of the machine
1. Connect the machine to the three-phase four-wire 380V power supply, and connect the ground wire at the same time;
2, the machine must be placed horizontally, the base parts must not be empty;
3. Turn on the power, observe the machine voltage display table, and proceed to the next step after the voltage meets the requirements;
4. Press the motor switch button to test run. After no error, stop the machine.
5, press the heating switch, set the temperature to the desired temperature value (different fresh leaves need different temperatures, generally 150 ° C), when the temperature reaches 50 ° C, start the main motor, let the cylinder run;
6. When all wirings are connected to the host after the power distribution cabinet, connect by number and cannot be connected incorrectly;
7. The “heating” button on the power distribution cabinet is an additional function. When the “heating” button is turned on, it is heated for full power, which is 80kw.
8. When the set temperature is reached, turn on the fan of each part and put it into fresh leaf production. The tea leaves are slightly thicker and the speed is not too slow. When the tea leaves are discharged from the discharge port, the dryness is observed.
9. The feeding hopper and the discharge hopper are installed on the screws at both ends of the machine, and can be fixed;
V. Maintenance and maintenance
1. Before using the machine, carefully check whether the solid parts such as silk are transported.
Cause loose, if any, tighten and use.
2. When the new machine leaves the factory, the transmission parts are coated with lubricating oil. After 50 hours of production, it is necessary to check whether there is oil shortage.
3. The machine should be placed in a dry place to avoid malfunction of the machine parts or electronic components.
4. Keep the child or the unrelated person and the machine at a certain distance when the machine is working.